Before quote
Send STEP/STP, 2D drawings, material, finish, quantity, tolerance notes, deadline, destination country, and NDA needs. Complete RFQs are reviewed within 24 hours.
Quality & evidence
Use this page to decide what evidence to request before production: DFM notes, process photos, CMM or FAI checks, material certificates, finish samples, packing photos, and export handoff details.
Send STEP/STP, 2D drawings, material, finish, quantity, tolerance notes, deadline, destination country, and NDA needs. Complete RFQs are reviewed within 24 hours.
Ask for DFM feedback, process route, critical dimension plan, surface finish feasibility, material availability, and confirmation of what will be inspected.
Request first article photos, CMM or FAI checks when applicable, material certs when available, finish photos, packing photos, and carrier handoff details.
Use these redacted templates to decide which documents belong in your RFQ. They are sample-only formats, not default deliverables.
Sample only. These files are not certificates or default shipment reports. COC, material certificate, dimensional report, CMM, FAI, finish approval sheet, packing checklist, and export handoff evidence must be agreed during RFQ.
Inspection documents
Quality evidence depends on the part, tolerance, material, and inspection scope. We keep the promise precise: these documents are available when agreed during RFQ, not implied for every order by default.
Useful for first article approval, drawing revision confirmation, and low-volume production launch.
Best for critical dimensions, GD&T callouts, datum-sensitive features, and fit-critical assemblies.
Available when material traceability matters and the requested grade can be sourced with paperwork.
Photos of cosmetic surfaces, color samples, masking, protective packing, labels, and export carton condition.
범위와 일정
CMM, FAI, 소재 추적성, 마감 승인, 포장 증빙은 검사 시간, 보고서 준비, 프로젝트 일정에 영향을 주므로 생산 전에 선택해야 합니다.
샘플 문서 패키지 요청부품에 GD&T 지시, 기준면 민감 형상, 맞춤 중요 보어 또는 단순 게이지로 신뢰 검증이 어려운 치수가 있는 경우.
시제품이 초기 외관 모델, 느슨한 맞춤 인클로저, 사진과 핵심 수동 확인만으로 구매자 판단이 가능한 콘셉트 샘플인 경우.
초품이 도면 개정, 소량 생산 시작, 공급업체 검증 또는 추가 부품 릴리스 전 검사 계획을 관리하는 경우.
구매자가 승인 또는 출하 전 합금, 수지 등급, 열처리, 배치 식별 또는 준수 문서를 확인해야 하는 경우.
No. CMM and FAI reports should be agreed during RFQ because they affect inspection time, cost, and schedule.
Yes. For suitable projects, DFocus can share production photos, finish photos, key measurement evidence, and packing photos before shipment.
Send CAD files, 2D drawings for critical tolerances, material, quantity, finish, inspection needs, shipping country, target deadline, and NDA requirements.
Certification boundary
DFocus does not treat every project as certification-backed by default. Inspection reports, material certificates, COC, FAI/CMM records, finish samples, packing photos, and export handoff evidence must be agreed during RFQ and quoted with the required scope.
Your quote can define the evidence package needed before shipment, including dimensional checks, material traceability, process photos, and packing proof.
A public page statement is not a certificate, regulated-device approval, or blanket system-certification guarantee. Certified entity, certificate number, scope, and expiry must be shown before a certification claim is used.
Tell engineering whether you need CMM, FAI, material certs, COC, finish photos, packing photos, automotive submission inputs, NDA, or export documentation.
DFocus PROTOTYPE 팀입니다.
CNC 가공, 3D 프린팅, 표면 처리 상담이 필요하신가요? 프로젝트 정보를 보내주시면 적합한 견적 루트로 안내하겠습니다.